log [2015/06/04 10:50] – [14th Meeting (28.05.2015)] epsatiseplog [2015/06/12 15:00] (current) – [15th week report (01.06.15-07.06.15)] team3
Line 78: Line 78:
 We are still working hard on poster, paper, video and presentation. The last steps came and we have to improve a lot in the wiki and we have to prefer the final presentation. We bought some devices for the Insectarium to install everything. Each of us knows his/her tasks and has a lot to do. We are still working hard on poster, paper, video and presentation. The last steps came and we have to improve a lot in the wiki and we have to prefer the final presentation. We bought some devices for the Insectarium to install everything. Each of us knows his/her tasks and has a lot to do.
 ==== 15th week report (01.06.15-07.06.15) ==== ==== 15th week report (01.06.15-07.06.15) ====
 +
 +The same like the last weeks. Work hard on the deliverables to finish them. Each of us improved the wiki if there are mistakes. We cut the material and check if all material are available. Each of us has his/her own tasks to do.
 ==== 16th week report (08.06.15-14.06.15) ==== ==== 16th week report (08.06.15-14.06.15) ====
 ===== Meetings ===== ===== Meetings =====
Line 271: Line 273:
  
 === Minute: === === Minute: ===
 +
 +We dicussed the questions and talked about the presentation how we should structure it.
 +Benedita explained us how to put the references into the wiki in the correct form.
 +We should think about our connections of the electronical part and start to test all devices.
 +Of course it is important to built the Insectarium faster now.
 ==== 16th Meeting (11.06.2015) ==== ==== 16th Meeting (11.06.2015) ====
 === Agenda: === === Agenda: ===
 +
 +
 === Minute: === === Minute: ===
 +
 +We're on the right track , follow the planning now and finish everything on the asked deadline.
 ==== Final Presentation (18.06.2015) ==== ==== Final Presentation (18.06.2015) ====
  